AI SDLC Work Units and Intent Vocabulary

Status: design proposal, 2026-10-07. Parent: #3625. No new intent below is implemented or authorized by this document. Existing intent routing remains authoritative. The spec-to-production trace is a dated operational audit, not proof that every current handoff is automatic.

Question

Should AI-assisted work be organized by calendar periods or verified outcomes? How can BaseCoat distinguish the requested outcome from execution topology, authorization and safety limits without confusing harness terminology?

AI can shorten implementation, but integration, review, external dependencies, capacity and operational observation still take time. Faster code generation does not establish production correctness or make time-based planning obsolete.

Option 1: Time-based work units

A sprint or review period groups work within a fixed interval. The interval ends even if some work remains unfinished; unfinished scope must be explicitly replanned, not declared complete.

  • Evidence: BaseCoat has sprint:, sprint labels, release grouping, weekly triage/hygiene/report jobs, and the current fleet: sprint-boundary bundle.
  • User impact: predictable priority reviews and coordination with human teams.
  • Implementation scope: preserve existing planning and reporting contracts.
  • Accessibility: familiar to agile teams, but requires explaining planning versus delivery.
  • Risks: artificial release waits, rollover hiding blocked work, and confusing period closure with verified feature completion.

Time boxes remain appropriate for discovery, experiments, operational observation and spending limits. A deadline is a constraint, not acceptance evidence. An elapsed time limit should produce a checkpoint or blocked/limited outcome, never successful completion by itself.

Option 2: Completion-based work units

A bounded scope progresses until explicit acceptance and delivery evidence passes, or it stops on a blocker, exhausted budget or revoked authority. Completion-based does not mean unbounded execution.

  • Evidence: BaseCoat already has spec acceptance, dependency-ordered wave:, explicit ship-it:/spec-2-prod:, exact-head checks, native merge queue, immutable promotion evidence and bounded control-loop contracts.
  • User impact: validated work can ship independently of a planning calendar.
  • Implementation scope: clarify state/exit contracts and vocabulary; reuse existing governance instead of introducing a second delivery engine.
  • Accessibility: outcome words are easier to discover than agent/harness metaphors.
  • Risks: ambiguous "done", endless loops, batch scope creep, evidence reuse for the wrong revision, or mistaking parallelism for authorization.

Recommendation

Use a hybrid: calendar-based priority/outcome reviews, completion-based execution and delivery, and time/cost/retry limits as independent safety budgets. No evidence currently justifies abolishing sprint planning everywhere.

Dimension Time-based planning Completion-based execution/delivery
Unit Review period / sprint Approved scope / change / bounded batch
Primary question What should we prioritize this period? What evidence makes this scope complete?
Boundary Scheduled review date Defined acceptance and target outcome
Incomplete work Explicit replan with blocker Resume from checkpoint or stop with reason
Release cadence Can coordinate releases; should not force a wait Release when gates and scope policy permit
Budget Period capacity Per-scope time, cost, retry and concurrency limits
Accountability Priority owner and review participants Scope owner, authority, execution owner and evidence
Measurement Commitments versus outcomes per period Lead time, blocked time, change failure, recovery, cost per outcome
Failure mode Rollover or "sprint done" without delivery Infinite continuation or "tests green" mistaken for production success

BaseCoat concepts: supported versus proposed

Existing concept Current supported role Proposed conceptual separation
fleet: Sprint lifecycle bundle; coordinator preflight; bounded continuation contracts Execution arrangement, not an outcome or delivery permission
sprint: Plan/execute/close out a sprint Optional planning/review period
wave: Dependency-ordered bounded batch Ready batch; membership and dependencies determine completion
autopilot: Continuous oldest-first delivery loop, serial or fleet Continuing execution policy with explicit scope/stop limits
feature: Design/implement/validate; feature-origin PR remains draft absent delivery consent Implementation work separate from authorization to deliver
plan:, issue:, portfolio: Planning, triage, relationship and project hygiene Work preparation and ordering; not approval
ship-it:, spec-2-prod: Explicit governed delivery routing with live approval/scope evidence Delivery outcome; candidate vocabulary migration only
release:, deploy: Release lifecycle and staged deployment Publication versus deployment to a named destination
audit:, investigate:, rca: Read-only assessment and diagnosis Evidence assessment, with distinct purpose
approved, copilot-agent Issue authority and assignment intent Authorization and actual assignment are different states
size:*, risk tiers Derived classification and policy gates Consequence/scope controls, not execution duration estimates
Sprint/wave labels Release grouping and traceability Keep until label policy is deliberately migrated
Merge queue Exact integration-tree checks and serialized landing Parallel preparation does not authorize parallel merges
vX.Y.Z tag and public publish Versioned release and transformed public payload Verified release identity; merge/issue closure is not delivery

The current routing disallows dual authoritative prefixes. Do not use fleet: ship-it: or assume the proposed prefixes are aliases today. Any future parallelism option must be orthogonal to outcome, preserve separate branch/worktree lanes, and keep dependent and release-affecting merges serialized.

Canonical naming and decision matrix

This matrix owns naming/status decisions within this proposal. The supported routes remain defined by the intent guide. The contracts and lifecycle vocabulary below elaborate outcomes, not additional aliases. Candidate names are not preferred or supported merely because their design documents have merged; distinctness and adoption remain separate.

Concept Supported route today Candidate / alternative Distinct boundary to establish Decision status / owner
Preparation plan:, issue:, portfolio: prepare: Bounded evidence/authority packet, not approval Unresolved distinctness; #3626
Specification PRD/spec synthesis; design: debate spec: / conceptual verb specify Testable specification, not approval or assignment No token selected; #3627
Implementation feature: build: / implement: Approved implementation versus compile-only artifact production Alternative unresolved; #3628
Review audit: and advisory review review: Findings/disposition, not an APPROVED GitHub review Distinctness unresolved; #3629
Delivery ship-it:, spec-2-prod: deliver: Verified authorized end-to-end target outcome Rename/alias/new-route decision unresolved; #3630
Publication release:, staged deploy: ship: / publish: Immutable publication versus deployment and later runtime verification Alternative/distinctness unresolved; #3631
Verification test:, audit:, release checks verify: Fresh revision/target evidence without automatic correction Concept only; no adoption decision
Continuation Existing bounded control loops resume: Current authority and checkpoint revalidation Concept only; no adoption decision
Reconciliation Drift/governance assessment reconcile: Report differences; writes need separate authority Concept only; no adoption decision
Learning learn: No new token Existing opt-in durable learning contract Supported; retain current route

Preferred policy is reuse of existing routes unless a distinct contract is demonstrated, not a preferred candidate spelling. Do not create another issue for an alternative already owned by #3626-#3631. Review is assessment; approval is an authenticated decision. Publish is release availability; verify is evidence for an exact target and observation window.

Proposed intent contracts

Each issue is a design proposal, not a mandate to add another prefix. Naming/status decisions are centralized in the matrix above; overlap must be resolved before routing implementation. Per-verb inputs, completion evidence, authorization boundaries, hold states and handoffs live in the shared intent work-unit contracts reference.

Proposal Requested outcome and completion unit Default boundary Existing overlap / open decision Issue
prepare: An actionable bounded work packet Assessment; no approval or implementation plan:, issue:, portfolio:; explicit permission for metadata writes #3626
spec: A testable specification with alternatives and acceptance Spec artifacts only; generation is not approval PRD/spec synthesis and design debate #3627
build: Approved scope implemented and validated Draft handoff absent separate delivery consent feature:; compile-only meaning may justify implement: instead #3628
review: Findings and disposition for artifacts/outcomes Read-only; no implicit GitHub APPROVED review audit:, advisory code review, post-delivery learning #3629
deliver: Approved scope reaches verified target outcome Explicit delivery authority; every boundary revalidated ship-it:/spec-2-prod:; rename versus alias unresolved #3630
ship: Validated immutable release published and verified Publication authority; no implementation scope expansion release:, deploy:, ship-it:; separate prefix may be unnecessary #3631

If both are adopted, deliver: owns the whole outcome; ship: owns only publication of a ready artifact. Do not give both identical scope. build: must not silently mean compile in one context and end-to-end delivery in another. review: must not silently submit approval or fix findings.

Completion and authorization model

A proposed work packet records source issue/spec revision, approved scope and non-goals, owner, dependencies, required evidence, destination, current authority and execution budgets. Track the last verified state, not just the last activity.

State Exit evidence Does not imply
Prepared Scope/dependencies/acceptance and next decision defined Implementation authorization
Specified Versioned testable contracts and rollout/rollback design Approved spec or generated approval
Authorized Current qualified issue/spec authority Feature-origin delivery consent unless separately validated
Implemented In-scope change and positive/negative test evidence Ready status, merge or production
Validated Fresh checks for the correct revision/tree Approval or correctness of a different artifact
Integrated Verified queue merge against intended base Release/tag creation
Published Intended version/artifact available at destination Healthy runtime or adoption
Verified Required target smoke/health/behavior evidence Permission for further scope
Closed Traceable acceptance and delivery ledger Erasing unresolved follow-up work

Blocked, paused, limited and cancelled are explicit non-success outcomes. Budget exhaustion records a checkpoint. An authorized scope change invalidates affected evidence and requires a new acceptance contract.

Solo-dev stays zero routine human PR reviews through XL, after applicable explicit intake and delivery authority. XXL and other explicit human boundaries remain. Prefixes, labels, green tests, generated comments and parallel execution cannot manufacture consent. Existing feature-origin markers, live receipts, delivery holds and trusted default-branch governance remain authoritative.

Suggested AI SDLC vocabulary

These are conceptual terms first, not a request to register additional prefixes.

Term Meaning Avoid confusing with
Outcome Observable user/operational result Number of tasks completed
Work packet Bounded source scope, decisions, constraints and evidence A pasted agent prompt
Change One cohesive reviewable implementation A planning period
Ready batch Explicit dependency-compatible set of actionable work Every issue in a backlog
Dependency frontier Work whose prerequisites are currently satisfied Maximum concurrency
Acceptance contract Measurable positive/negative requirements Deadline or vague "done"
Evidence bundle Revision/target-bound checks and artifacts A dispatch marker
Decision record Alternatives, rationale and accepted constraints Implementation authorization
Checkpoint Durable verified progress and resumable next action Success or a fresh restart
Blocker Named unmet condition, owner and recovery action Mere age or inactivity
Execution budget Time/cost/retry/concurrency limits Acceptance criteria
Publication Making an immutable release available Merge or production health
Verification window Required runtime observation after publication An arbitrary sprint
Review period Scheduled priority/outcome/learning assessment Mandatory release interval
Completion ledger Source-to-change-to-release-to-target evidence Closed issue count

Lifecycle and control verbs

The conceptual lifecycle is prepare -> specify -> decide -> implement -> verify -> publish -> observe -> learn. This is not a mandatory sequence of prefixes or additional approvals. Iteration may revisit earlier stages; deliver: would own the authorized end-to-end outcome rather than introduce a separate engine for every stage.

Verb Bounded outcome Authority / stop boundary Existing overlap
Verify Acceptance or production evidence for an exact revision and target Gather/report proof; no automatic fix, approval or deployment test:, audit:, release gates
Resume Continue from a verified checkpoint Recheck live authority, target, blockers and budget; never inherit revoked consent Control-loop continuation, PR lifecycle
Reconcile Difference between intended and actual state, with a correction plan Read-only by default; corrections require explicit write authority Governance/drift audits
Recover Restore a failed delivery or service Bounded approved remediation; destructive rollback/cutover needs applicable authority rca:, bug:, build guard
Observe Runtime health, adoption, cost and reliability evidence Defined target/window/budget; monitoring does not mutate service Operational monitoring
Learn Durable guidance from outcomes and recurring signatures Existing opt-in contract, not automatic policy rewriting Already supported learn:
Decompose Independent scopes and a dependency graph Planning only; child work does not inherit approval automatically plan:, scope validation, proposed prepare:
Decide Recorded choice, alternatives and constraints Decision acceptance is not implementation/delivery consent Design debate
Pause Execution checkpoint and suspended new side effects Handle in-flight work explicitly; no promise of undoing published changes Delivery hold, control-loop stop
Cancel Terminate a scope and record outstanding effects Separate rollback/cleanup authority; cancellation is not successful completion Control-loop cancellation
Retire Safely remove an obsolete capability Dependency, retention, ownership and rollback checks before authorized removal chore:, decommissioning
Implement Code change for approved specification Validation and draft handoff absent delivery authority Clearer candidate than ambiguous build:
Publish Make a validated immutable release available Explicit destination/version authority and verified results release:, proposed ship:

Pause, cancel, resume and recover are control actions, not mandatory lifecycle stages. Observation time can be a required acceptance condition; it is not the same as calendar-based sprint completion.

Suggested new intents

Prioritize debate of verify:, resume: and reconcile: because their exits are distinct: fresh proof, safe continuation, and intended-versus-actual alignment. A proposal must define input evidence, read/write permissions, non-success outcomes and deterministic routing before it becomes supported.

For verify:, test stale revision and wrong-target rejection; for resume:, test revoked authorization, exhausted budgets and changed dependencies; for reconcile:, test report-only operation and separately authorized corrections.

Consider implement: as an alternative within #3628, not an additional synonym for build:. Reserve build terminology for compilation/artifact production unless its broader implementation meaning is explicitly selected. Likewise, compare publish: with ship: in #3631 before choosing either. Keep recover, observe, decompose, decide, pause, cancel and retire as vocabulary unless existing routes cannot express their required boundary.

learn: is already supported; it is not a new-intent proposal. None of the other verbs in this section is registered as a prefix by this document. Do not create aliases solely to replace one ambiguous word with another.

Keyword index

These are documentation/search keywords, not parser tokens, routing aliases or delivery directives. Use the canonical naming/decision matrix for status; this index cannot select a preferred name or register a synonym.

Search concept Keywords
Work units AI SDLC, time-based, time-boxed, completion-based, outcome-based, bounded scope, review period, ready batch
Definition prepare, spec, specify, decompose, decide, work packet, acceptance contract, dependency frontier
Implementation build, implement, change, artifact, positive/negative tests
Evidence review, verify, evidence bundle, exact revision, target identity, completion ledger
Delivery deliver, ship, publish, release, production verification, rollback readiness
Continuation resume, checkpoint, reconcile, drift, blocker, execution budget
Operational control recover, pause, cancel, retire, in-flight effects, retention
Outcomes and learning observe, verification window, learn, adoption, reliability, cost per outcome

Validation and migration

Measure per-scope lead time, execution versus waiting/blocked time, failure and recovery, cost, rework, and verified production outcomes. Compare similar scopes/risk tiers; faster generation or more PRs does not prove better delivery. Audit a complete packet through acceptance and publication, including revoked authority, stale evidence, dependency failure and exhausted-budget scenarios.

Before adding a token, require a distinct boundary, deterministic parser, positive/negative routing tests, known read/write effects, documented target state and reuse of existing policy helpers. Update canonical/distributed instructions, skills, workflows, downstream installers and examples together where applicable; regenerate tracked manifests when distributed assets change. A docs-only proposal does not require that runtime migration.

Retain existing prefixes during a deliberate compatibility period. Do not rewrite issue labels, approval records or source markers automatically. Neither a rename nor an alias may broaden authority. Quoted/fenced/bulleted/ embedded examples, dual prefixes, defer modifiers and unauthorized actors must remain non-executable or explicitly rejected.

Approval boundary

The user authorized comparison documentation and six proposal issues. Naming decisions, parser aliases, workflow changes, label migrations and runtime execution require separate explicit approval and approved implementation specs.